Central Pump Station

  • Pipeline Diameter: 84″
  • Located at N. Fry Road at Clay Road in Katy, Texas

Anticipated Construction Program Schedule

DESIGN

Ends Q3/2020

BID

Q3-Q4/2020

CONSTRUCTION

Q4/2020 – Q1/2023

Design Consultant: AECOM

Contractor: (To be posted)

PDF Map: (To be posted)

Contractor Notice to Proceed: (To be posted)

Project Completion: (To be posted)

Dates are subject to change