Segment C (C1 & C2)

Approximately 10 miles of 84-inch diameter pipeline.

The Surface Water Supply Project is currently advertising its Segment C project for the construction of approximately 52,000 linear feet of 84-inch, 6,400 linear feet of 66-inch, and 2,800 linear feet of 36-inch diameter water lines with all necessary valves and appurtenances, from east of Westfield Village Drive to east side of Skyview Drive. The proposed water line installation will consist of primarily open cut construction; however, tunnels are required at some crossings of Harris County roads, TxDOT roads, Harris County Flood Control District (HCFCD) drainage systems, and private pipelines. Details of this work are provided in the Construction Drawings and Project Manual found at: https://www.civcastusa.com/project/5ee27a4c041b029114775c0c/summary An invitation to bidders is also attached for download: 00020 Invitation to Bidders_06032020 The bid date has been extended to July 30th at 2pm. Visit Civcast for further details.
Click here to visit the Segment C construction information page on this website

These maps are for illustration purposes only.  Lines are not to scale.

Drone Footage Segment C – For information only 6-2-2020

Click the gear icon on the player below to control the video playback speed.

Segment C1 Location: Westfield Village to Highway 6

  • Pipeline Diameter: 84″
  • 5.2 Miles in length

Anticipated Construction Program Schedule

DESIGN

Spring 2020

BID

Summer 2020 – Fall 2020

CONSTRUCTION

Fall 2020 – Spring 2024

Design Consultant: Freese and Nichols, Inc.

Contractor: (To be determined)

PDF Map: SWSP – Segment C1

Contractor Notice to Proceed: (To be determined)

Project Completion: (To be determined)

Dates are subject to change

SWSP - Segment C1

Segment C2 Location: Highway 6 to Brittmoore Road

  • Pipeline Diameter: 84″
  • 4.9 miles in length

Anticipated Construction Program Schedule

DESIGN

Spring 2020

BID

Summer 2020 – Fall 2020

CONSTRUCTION

Fall 2020 – Late Spring 2024

Design Consultant: Freese and Nichols, Inc.

Contractor: (To be determined)

PDF Map: SWSP – Segment C2

Contractor Notice to Proceed: (To be determined)

Project Completion: (To be determined)

Dates are subject to change

SWSP - Segment C2